The project is comprised of three mining concessions (approximately 3000 hectares)
located outside of the towns of San Pablo and Simiti, Department of Bolivar.
Potential economic deposits in the project include alluvial gold and clays.
No corporate competition exists in the project area. Mechanized small scale mining
by local miners (retro excavators and gravel pumps) is being undertaken in the area.
The region has fair access and general logistics.
However, infrastructure is at a minimum.